Client

Yarra Valley Water and MFJ Constructions

Site

Wonga Park, Victoria

Installed

2011-2013

Melbourne Pipelines Team

Lou Razzi
Leigh Sinclair
Shem Macdonald
Rob Razzi
Glenn Thompson
Steve Tsotsos

Purpose:

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water have developed a strategic objective of completing their sewerage backlog program by 2025.

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a hybrid sewerage reticulation system for approximately 600 properties.

  • 11.4km of PE pressure sewers up to DN90 in size.

  • 9.2km of PVC gravity sewers (up to DN250 in size and 10m deep).

  • 374 maintenance structures (up to 10m deep).

  • Flushing/scour points, isolation and air valves.

  • Road crossings and property connections.