Donvale Backlog Reticulation, Package E
Client
Yarra Valley Water
Site
Donvale, Victoria
Installed
2017-2019
Melbourne Pipelines Team
Leigh Sinclair
Shem Macdonald
Rob Razzi
Glenn Thompson
John Torre
John Williamson
Steve Tsotsos
Steve Avramovski
PURPOSE
There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services. These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their sewerage backlog program by 2025.
What we accomplished:
The scope of this project that MPL completed for Yarra Valley Water was:
Construction of a hybrid sewerage reticulation system for approximately 290 properties.
2.6km of PE pressure sewers up to DN63 in size.
8.4km of PVC/PE gravity sewers (up to DN315 in size and 10m deep).
121 maintenance structures (up to 10m deep).
A number of flushing/scour points, isolation and air valves.
A number of road crossings and property connections.