Donvale Backlog Reticulation, Package E

 

Client

Yarra Valley Water

Site

Donvale, Victoria

Installed

2017-2019

Melbourne Pipelines Team

Leigh Sinclair
Shem Macdonald
Rob Razzi
Glenn Thompson
John Torre
John Williamson
Steve Tsotsos                                   
Steve Avramovski

PURPOSE
There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their sewerage backlog program by 2025.

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a hybrid sewerage reticulation system for approximately 290 properties.

  • 2.6km of PE pressure sewers up to DN63 in size.

  • 8.4km of PVC/PE gravity sewers (up to DN315 in size and 10m deep).

  • 121 maintenance structures (up to 10m deep).

  • A number of flushing/scour points, isolation and air valves.

  • A number of road crossings and property connections.