Client

Yarra Valley Water and Di Carlo Civil

Site

Donvale, Victoria

Installed

2016-2017

Melbourne Pipelines Team

Leigh Sinclair
Shem Macdonald
Glenn Thompson
Steve Tsotsos                                

Purpose:

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their sewerage backlog program by 2025.

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a gravity sewerage reticulation system for approximately 9 properties.

  • 262m of PVC/PE gravity sewers (up to DN150 in size and up to 6m deep).

  • 5 maintenance structures (up to 6m deep).

  • A number of property connections.

  • Live sewer works.

  • 6m stainless steel vent stack.