Client

Yarra Valley Water

Site

Park Orchards, Victoria

Installed

2021-22

Melbourne Pipelines Team

Leigh Sinclair
Shem Macdonald
Glenn Thompson
Rob Razzi
Steve Avramovski
John Williamson

Purpose:

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their Community Sewerage Program by 2035.

 

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a gravity and pressure sewerage reticulation system for approximately 64 properties.

  • 451m of PE pressure sewers up to DN63 in size and 775m of PVC gravity sewer DN150 in size.

  • 8 maintenance holes, 5 maintenance shafts, 2 inspection shafts.

  • 1 isolation valve, 1 flushing points, 1 air valve and green odour dome filter.

  • Gravity property connections including 23 non live sewer and 11 live sewer conditions (includes road crossing and non-road crossing connections).

  • Pressure property connections including 18 non live sewer and 12 live sewer conditions (includes road crossing and non-road crossing connections).

  • Multiple live sewer works and live sewer maintenance hole modifications and lining.