There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their Community Sewerage Program by 2035.

 

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • The replacement of a significant damaged DN315 gravity sewer (poor grades and sewer blockages).

  • 164m of DN315 PE gravity sewer.

  • Bends and live sewer works to connect to two existing maintenance holes.

  • Replacement of existing property connection with new property connection.

  • Abandon existing sewer and property connection.