Client

Yarra Valley Water

Site

Olinda, Victoria

Installed

2024-25

 

Purpose:

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their Community Sewerage Program by 2035.

Melbourne Pipelines Team

Leigh Sinclair
Shem Macdonald
Alec Wood
Glenn Thompson
Rob Razzi
Steve Avramovski
John Williamson

 

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a pressure sewerage reticulation system for approximately 147 properties.

  • 4.7km of PE pressure sewers DN50 up to DN125 in size.

  • 20 isolation valves, 15 flushing points, 4 non-return valves, 5 air valves and green odour dome filter.

  • 147 pressure property connections (including road crossing and non-road crossing connections).