Client

Yarra Valley Water

Site

Kallista, Victoria

Installed

2019

Melbourne Pipelines Team

Leigh Sinclair
Shem Macdonald
Glenn Thompson
Rob Razzi
Steve Avramovski
John Torre
John Williamson                                

Purpose:

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their sewerage backlog program by 2035.

 

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a transfer rising main (4.1km of DN160 PE sewer).

  • A number of flushing/scour points.

  • A number of isolation and air valves.

  • A number of road crossings.