Client
Yarra Valley Water
Site
North Warrandyte, Victoria
Installed
2015
Melbourne Pipelines Team
Leigh Sinclair
Shem Macdonald
Rob Razzi
Glenn Thompson
Steve Tsotsos
Purpose:
There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services. These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their sewerage backlog program by 2025.
What we accomplished:
The scope of this project that MPL completed for Yarra Valley Water was:
1.3km of DN250 PE Rising Main (directionally drilled and open cut).
1 isolation valve, 3 flushing points and 1 air valve (all cast in-situ)
Anchor blocks.