PURPOSE
There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services. These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their sewerage backlog program by 2025.

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • 1.3km of DN250 PE Rising Main (directionally drilled and open cut).
  • 1 isolation valve, 3 flushing points and 1 air valve (all cast in-situ)
  • Anchor blocks.