Client

Yarra Valley Water

Site

Monbulk, Victoria

Installed

2021-23

Melbourne Pipelines Team

Leigh Sinclair
Shem Macdonald
Glenn Thompson
Rob Razzi
John Torre
John Williamson                                

Purpose:

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their Community Sewerage Program by 2035.

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a pressure sewerage reticulation system for approximately 237 properties.

  • 6.2km of PE pressure sewers up to DN90 in size and 2.1km of PE rising mains DN125 in size.

  • 46 isolation valves, 42 flushing points, 1 air valve and green odour dome filter.

  • 37 road crossing and 200 non road crossing property connections.

  • Booster Pump Station (mechanical, civil, structural and electrical works).