Client

Yarra Valley Water

Site

Donvale, Victoria

Installed

2019-20

Melbourne Pipelines Team

Leigh Sinclair
Shem Macdonald
Rob Razzi
Glenn Thompson
John Torre
John Williamson                                

Purpose:

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their sewerage backlog program by 2035.

 

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a hybrid sewerage reticulation system for approximately 185 properties.

  • 1.2km of PE pressure sewers up to DN63 in size.

  • 5.4km of PVC/PE gravity sewers up to DN225 in size and up to 9.0m deep.

  • 71 maintenance structures (up to more than 9.0m deep).

  • 8 flushing/scour points.

  • 10 isolation and air valves.

  • Several road crossings and property connections.

  • Decommission SPS094 and 095.