Client
Yarra Valley Water
Site
Warrandyte, Victoria
Installed
2012-2014
Melbourne Pipelines Team
Lou Razzi
Leigh Sinclair
Shem Macdonald
Rob Razzi
Glenn Thompson
Steve Tsotsos
Purpose:
There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services. These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water have developed a strategic objective of completing their sewerage backlog program by 2025.
What we accomplished:
The scope of this project that MPL completed for Yarra Valley Water was:
Construction of a hybrid sewerage reticulation system for approximately 285 properties.
8.2km of PE pressure sewers up to DN63 in size.
5.7km of PVC/PE gravity sewers (up to DN150 in size and 5m deep).
100 maintenance structures.
Flushing/scour points, isolation and air valves.
Road crossings and property connections.
Live sewer works.