Purpose:
There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services. These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their Community Sewerage Program by 2035.
What we accomplished:
The scope of this project that MPL completed for Yarra Valley Water was:
Completing Portion A design stage resulting in planning permit exemption.
Construction of a hybrid sewerage reticulation system for approximately 117 properties.
1.9km of PE pressure sewers up to DN90 in size.
1.9km of PVC/PE gravity sewers up to DN225 in size and up to 6.0m deep.
27 maintenance structures (up to more than 6.0m deep).
A number of flushing/scour points.
A number of isolation and air valves.
A number of road crossings and property connections.
Live sewer connections.