Client

Yarra Valley Water

Site

Wesburn, Victoria

Installed

2019-21

Melbourne Pipelines Team

Leigh Sinclair
Shem Macdonald
Glenn Thompson
Rob Razzi
John Torre
John Williamson                                

Purpose:

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their Community Sewerage Program by 2035.

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Completing Portion A design stage resulting in planning permit exemption.

  • Construction of a hybrid sewerage reticulation system for approximately 117 properties.

  • 1.9km of PE pressure sewers up to DN90 in size.

  • 1.9km of PVC/PE gravity sewers up to DN225 in size and up to 6.0m deep.

  • 27 maintenance structures (up to more than 6.0m deep).

  • A number of flushing/scour points.

  • A number of isolation and air valves.

  • A number of road crossings and property connections.

  • Live sewer connections.