Client

Yarra Valley Water

Site

Kallista & The Patch, Victoria

Installed

2022-23

Melbourne Pipelines Team

Leigh Sinclair
Shem Macdonald
Alec Wood
Glenn Thompson
Rob Razzi
Steve Avramovski
John Williamson

Purpose:

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services.  These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their Community Sewerage Program by 2035.

What we accomplished:

The scope of this project that MPL completed for Yarra Valley Water was:

  • Construction of a pressure sewerage reticulation system for approximately 318 properties.

  • 8.6km of PE pressure sewers up to DN90 in size.

  • 33 isolation valves, 27 flushing points, 4 air valves and green odour dome filters.

  • 263 pressure property connections.

  • 55 pressure property connections into existing PE transfer main.

  • Booster Pump Station (mechanical, civil, structural and electrical works).