Wonga Park Backlog Sewerage Scheme
Purpose
There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services. These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water have developed a strategic objective of completing their sewerage backlog program by 2025.
What we accomplished
The scope of this project that MPL completed for Yarra Valley Water was:
- Construction of a hybrid sewerage reticulation system for approximately 600 properties.
- 11.4km of PE pressure sewers up to DN90 in size.
- 9.2km of PVC gravity sewers (up to DN250 in size and 10m deep).
- 374 maintenance structures (up to 10m deep).
- Flushing/scour points, isolation and air valves.
- Road crossings and property connections.
Client
MFJ Constructions, Yarra Valley Water
Site
Wonga Park, Victoria
Installed
2011-
2013
Team
Lou Razzi
Leigh Sinclair
Shem Macdonald
Rob Razzi
Glenn Thompson
Steve Tsotsos
Melbourne Pipelines approached the job very professionally. We wish we could deal as easily with all people that come onto our property. They certainly helped inspire confidence.
Donvale Customer



