Purpose

There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services. These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their sewerage backlog program by 2025.

What we accomplished

The scope of this project that MPL completed for Yarra Valley Water was:

  • 1.3km of DN250 PE Rising Main (directionally drilled and open cut).
  • 1 isolation valve, 3 flushing points and 1 air valve (all cast in-situ)
  • Anchor blocks.
Client
Yarra Valley Water
Site
North Warrandyte, Victoria
Installed
2015
Team
Leigh Sinclair
Shem Macdonald
Rob Razzi
Glenn Thompson
Steve Tsotsos
I would consider Melbourne Pipelines to be a contractor that looks after our interests and is responsive to our needs. It provides excellent customer services and often suggests improvements to our designs. It has implemented good quality, environmental and safety management plans. Melbourne Pipelines are definitely a dependable and reliable partner in the delivery of quality assets to service our customers.
Mon Gan
Team Manager Sewerage Growth Projects Yarra Valley Water
Melbourne Pipelines have delivered a number of complex projects for YVW over the years with much success. I have been fortunate enough to work with Leigh, Shem and the team on gravity sewer, pressure sewer, sewage pumping station and rising main projects over the past 4 years. Their professionalism, attention to detail, and commitment to having a strong safety culture, ensures they deliver quality assets on time at a very competitive price.
Luke Hately
North Warrandyte Project Manager Yarra Valley Water