Launching Place Community Sewerage Project – Package A
Purpose
There are a number of suburbs located within Yarra Valley Water’s supply area requiring reticulated sewerage services. These areas constitute Yarra Valley Water’s sewerage backlog program. In response Yarra Valley Water has developed a strategic objective of completing their Community Sewerage Program by 2035.
What we accomplished
The scope of this project that MPL completed for Yarra Valley Water was:
- Completing Portion A design stage resulting in planning permit exemption.
- Construction of a hybrid sewerage reticulation system for approximately 117 properties.
- 1.9km of PE pressure sewers up to DN90 in size.
- 1.9km of PVC/PE gravity sewers up to DN225 in size and up to 6.0m deep.
- 27 maintenance structures (up to more than 6.0m deep).
- A number of flushing/scour points.
- A number of isolation and air valves.
- A number of road crossings and property connections.
- Live sewer connections.
Client
Yarra Valley Water
Site
Wesburn, Victoria
Installed
2019-21
Team
Leigh Sinclair
Shem Macdonald
Glenn Thompson
Rob Razzi
John Torre
John Williamson
Melbourne Pipelines demonstrates exceptional partnership and industry leading expertise. It was a pleasure to spend over 5 years working closely with Melbourne Pipelines to deliver Yarra Valley Water’s Community Sewerage Program. At all times asset quality, safety and exemplary customer service were a priority for Melbourne Pipelines. Leigh and his team have a culture of continuous improvement, always transferring learnings from one project to the next, and working with the client to improve overall the overall delivery process and design quality. Melbourne Pipelines routinely adopt an early engagement approach to identify and address risks before they can be realised and collaboratively solve problems with all relevant stakeholders jointly.
Sally Crook
Community Sewerage Program Team Leader Yarra Valley Water