North Warrandyte Siphon
Purpose
The North Warrandyte scheme has been separated into several construction packages, one of those being the North Warrandyte Siphon. This project relates to the construction of the Siphon and associated works. The Siphon, which goes under the Yarra River, is required to service approximately 1000 properties in North Warrandyte. With the majority of the reticulation construction completed the timing and execution of this project program was critical for the success of the project.
What we accomplished
The scope of this project that MPL completed for Yarra Valley Water was:
- Set out, service locating and proving.
- Site preparation and earthworks including site fill and disposal of excess excavated materials.
- Supply of all materials, plant and labour required for the project.
- Installation of pipelines and emergency relief structure (up to 4m deep and DN355 PE in size).
- Installation of dual siphon under the Yarra River and PE welding (up to 10m deep and DN355 PE in size).
- Connection to the existing sewer (live sewer works).
- Acceptance testing and asset recording.
- Reinstatement works.
Client
Yarra Valley Water
Site
North Warrandyte, Victoria
Installed
2016-
2017
Team
Leigh Sinclair
Shem Macdonald
Rob Razzi
Glenn Thompson
Steve Avramovski
Steve Tsotsos
Melbourne Pipelines management and staff take safety very seriously. Their experience and cooperation means no task is too difficult to overcome. They always work in well with the client and stakeholders
Colin Hess
Compliance Officer Yarra Valley Water

I would consider Melbourne Pipelines to be a contractor that looks after our interests and is responsive to our needs. It provides excellent customer services and often suggests improvements to our designs. It has implemented good quality, environmental and safety management plans. Melbourne Pipelines are definitely a dependable and reliable partner in the delivery of quality assets to service our customers.
Mon Gan
Team Manager Sewerage Growth Projects Yarra Valley Water

Melbourne Pipelines were selected not only for their history of delivery of quality assets, but also for the way they carry out their work. Although one of the most difficult high risk construction projects to be undertaken in Yarra Valley Water’s service area, MPL met every challenge with a prompt and effective solution. Continually changing requirements from stakeholders did not hamper Melbourne Pipeline’s efforts to deliver the North Warrandyte Siphon project on time and exceeded expectations with respect to quality and cost.
Lisa Fragomeni
North Warrandyte Siphon Project Manager Yarra Valley Water