Chirnside Park Sewerage System Upgrade
Purpose
Yarra Valley Water are required to upgrade sewerage pump stations and emergency storages that are not performing adequately to minimise the risk of sewerage spills to the environment. Two pump stations at Chirnside Park were identified as requiring replacement.
What we accomplished
The scope of this project that MPL completed for Yarra Valley Water was:
- Construction of sewage pump station and associated sewer works.
- Wet well (up to 9m deep).
- Gravity sewers and rising mains (1.5km up to DN300 in size and 7m deep).
- Maintenance structures and emergency relief structure.
- Air valve, valve and flow meter pits.
- Concrete works (hardstand and access track).
- Mechanical and electrical works.
- Live sewer works.
Client
Yarra Valley Water
Site
Chirnside Park, Victoria
Installed
2010-11
Team
Lou Razzi
Leigh Sinclair
Glenn Thompson